|
Post by gothic021 on Aug 14, 2016 7:18:29 GMT -8
New big project a of Oshkosh prime mover,6 x 6 build one truck at a time budget allows,resin cabs pay-hauler tires with planetary hubs stacked 1/2 inch frames oscillating fifth wheels, 100 ton winches,cat 3408, loads and loads of details lots of scratch building should take me a few months to build more to come soon.
|
|
|
Post by gothic021 on Aug 14, 2016 7:18:53 GMT -8
|
|
|
Post by gothic021 on Aug 14, 2016 7:23:03 GMT -8
|
|
|
Post by gothic021 on Aug 14, 2016 7:33:28 GMT -8
Above pics of materials from plastruct, winches from Mo'luminum still need to get parts from Dave at ATIM to be used in the be used in the build.
|
|
|
Post by tufftin on Aug 14, 2016 10:34:06 GMT -8
Looks like a tough scratch build in the works.
|
|
|
Post by gothic021 on Aug 16, 2016 4:35:33 GMT -8
|
|
|
Post by gothic021 on Aug 16, 2016 18:01:07 GMT -8
Oh yes indeed tufftin it will take me a few months
|
|
|
Post by tufftin on Aug 17, 2016 10:34:43 GMT -8
It will be fun to watch your build.
|
|
|
Post by gothic021 on Aug 20, 2016 1:10:03 GMT -8
I fond this pic of a suspension for this build reference to scratch build from i will have to guess on dimensions get it as close as i can.
|
|
|
Post by gatorincebu on Aug 20, 2016 13:34:09 GMT -8
It will be fun to watch your build. Oh yea !! Now you have my attention. Like Mike said. I am looking forward to following this build. Be Well Gator
|
|
|
Post by gothic021 on Aug 22, 2016 6:19:21 GMT -8
I will be purchasing parts and materials to build one truck at a time its what i can afford so it will take me a few months to build both.
|
|
|
Post by tufftin on Aug 22, 2016 13:36:26 GMT -8
Take as long as you need or want. I'm not double parked.
|
|
|
Post by gothic021 on Aug 23, 2016 11:03:33 GMT -8
Cool lol
|
|
|
Post by gothic021 on Aug 27, 2016 6:40:28 GMT -8
|
|
|
Post by gothic021 on Aug 27, 2016 6:44:53 GMT -8
I scratch built the walking beam suspension took me 12 hours needs some filling in sanding ready to resin cast.
|
|